An optimisation process to motivate effective adoption of BIM for refurbishment of complex buildings in New Zealand

dc.citation.issue4
dc.citation.volume8
dc.contributor.authorOkakpu A
dc.contributor.authorGhaffarianHoseini A
dc.contributor.authorTookey J
dc.contributor.authorHaar J
dc.contributor.authorGhaffarian Hoseini A
dc.date.accessioned2024-06-05T01:08:29Z
dc.date.available2024-06-05T01:08:29Z
dc.date.issued2019-12
dc.description.abstractDespite the multidisciplinary networks involved in refurbishment of complex building projects, the lack of BIM adoption signifies lack of real BIM benefits towards acceptance of BIM within Architecture, Engineering and Construction (AEC). To this end, this study empirically examines the potential real benefits between traditional network and BIM network for a real-time refurbishment case study project, through agent-based simulation modelling. A social network analysis theory is adapted to model the project interaction networks and a BIM prototype network. An assessment of the main stakeholders for BIM perception is carried out. We offered three prototype interaction networks for comparison of real BIM benefit. An agent-based Bayesian network model is used to simulate the propagation of design error within the project networks. The result of the analysis show that BIM project diffuses error efficiently, while stakeholders recovers faster and nearly at the same time than traditional network. The optimised network shows better performance to the traditional network, when there is early involvement of subcontractors. The main contribution of this study is providing a novel approach to compare real benefits for traditional method to BIM method for refurbishment project and to provide avenue for project stakeholders to optimise their interaction through adoption of BIM.
dc.description.confidentialfalse
dc.edition.editionDecember 2019
dc.format.pagination646-661
dc.identifier.citationOkakpu A, GhaffarianHoseini A, Tookey J, Haar J, Ghaffarian Hoseini A. (2019). An optimisation process to motivate effective adoption of BIM for refurbishment of complex buildings in New Zealand. Frontiers of Architectural Research. 8. 4. (pp. 646-661).
dc.identifier.doi10.1016/j.foar.2019.06.008
dc.identifier.eissn2095-2643
dc.identifier.elements-typejournal-article
dc.identifier.issn2095-2635
dc.identifier.piiS2095263519300548
dc.identifier.urihttps://mro.massey.ac.nz/handle/10179/69724
dc.languageEnglish
dc.publisherHigher Education Press Limited Company. Publishing services by Elsevier B.V. on behalf of KeAi Communications Co. Ltd.
dc.publisher.urihttps://www.sciencedirect.com/science/article/pii/S2095263519300548
dc.relation.isPartOfFrontiers of Architectural Research
dc.rights(c) The author/sen
dc.rights.licenseCC BY-NC-NDen
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/en
dc.subjectBuilding information modelling
dc.subjectStakeholders interaction
dc.subjectOptimisation process
dc.subjectSimulation modelling
dc.subjectRefurbishment project
dc.subjectNew Zealand
dc.titleAn optimisation process to motivate effective adoption of BIM for refurbishment of complex buildings in New Zealand
dc.typeJournal article
pubs.elements-id459460
pubs.organisational-groupOther
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Published version.pdf
Size:
3.9 MB
Format:
Adobe Portable Document Format
Description:
Evidence
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
9.22 KB
Format:
Plain Text
Description:
Collections