Catastrophic transitions of construction contracting behavior
dc.citation.issue | 12 | |
dc.citation.volume | 134 | |
dc.contributor.author | Cheung SO | |
dc.contributor.author | Yiu TW | |
dc.contributor.author | Leung AYT | |
dc.contributor.author | Chiu OK | |
dc.date.available | 2008-12 | |
dc.date.issued | 24/11/2008 | |
dc.description | "This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://ascelibrary.org/doi/10.1061/%28ASCE%290733-9364%282008%29134%3A12%28942%29.” | |
dc.description.abstract | The ways to manage a construction project very much depend on the attitude of the people involved. Collectively this is identified as construction contracting behavior (CCB). The CCB of the construction industry is adversarial as pinpointed in many industry-wide reviews. A more cooperative project delivery approach has therefore been advocated. In fact, drive for efficiency provides the incentive for cooperation. Nevertheless, members of a project team, in representing their respective organizations, are often in conflict. The dichotomous pair of cooperation and aggression forces therefore coexist. It is not uncommon to note that CCB turns aggressive as the construction activities of a project intensify. This change is often sudden and thus matches well with the phenomenon of hysteresis described by the catastrophe theory (CT). It is hypothesized that the dynamics of CCB can be modeled by CT. The three-variable CT models include CCB (as dependent variable), cooperation forces (as normal factor) and aggression forces (as splitting factor). With data collected from a survey fitted by the Cuspfit program, it was found that trust intensity is an effective normal factor. Contract incompleteness and competitive inertia are splitting factors that trigger aggression. © 2008 ASCE. | |
dc.description.publication-status | Published | |
dc.format.extent | 942 - 952 | |
dc.identifier | http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000260936700003&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=c5bb3b2499afac691c2e3c1a83ef6fef | |
dc.identifier.citation | JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (12), pp. 942 - 952 | |
dc.identifier.doi | 10.1061/(ASCE)0733-9364(2008)134:12(942) | |
dc.identifier.eissn | 1943-7862 | |
dc.identifier.elements-id | 425117 | |
dc.identifier.harvested | Massey_Dark | |
dc.identifier.issn | 0733-9364 | |
dc.identifier.uri | https://hdl.handle.net/10179/16075 | |
dc.relation.isPartOf | JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT | |
dc.relation.replaces | http://hdl.handle.net/123456789/19163 | |
dc.relation.replaces | 123456789/19163 | |
dc.relation.replaces | http://hdl.handle.net/123456789/21335 | |
dc.relation.replaces | 123456789/21335 | |
dc.relation.replaces | http://hdl.handle.net/123456789/21336 | |
dc.relation.replaces | 123456789/21336 | |
dc.relation.replaces | http://hdl.handle.net/123456789/21337 | |
dc.relation.replaces | 123456789/21337 | |
dc.subject.anzsrc | 0905 Civil Engineering | |
dc.subject.anzsrc | 1202 Building | |
dc.subject.anzsrc | 1504 Commercial Services | |
dc.title | Catastrophic transitions of construction contracting behavior | |
dc.type | Journal article | |
pubs.notes | Not known | |
pubs.organisational-group | /Massey University | |
pubs.organisational-group | /Massey University/College of Sciences | |
pubs.organisational-group | /Massey University/College of Sciences/School of Built Environment |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Catastrophic Transitions of Construction Contracting Behavior.pdf
- Size:
- 826.77 KB
- Format:
- Adobe Portable Document Format
- Description: