Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register using a personal email and password.Have you forgotten your password?
Repository logo
    Info Pages
    Content PolicyCopyright & Access InfoDepositing to MRODeposit LicenseDeposit License SummaryFile FormatsTheses FAQDoctoral Thesis Deposit
  • Communities & Collections
  • All of MRO
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    New user? Click here to register using a personal email and password.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Weerakkody W"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • Loading...
    Thumbnail Image
    Item
    Identifying and Prioritizing Critical Risk Factors in the Context of a High-Voltage Power Transmission Line Construction Project: A Case Study from Sri Lanka
    (MDPI, Basel, Switzerland, 2024-12) Weerakkody W; Rathnayaka B; Siriwardana C; Luongo A; Giunta MS
    This study addresses critical risk factors in high-voltage power transmission line (HVPTL) construction projects, which are vital components of national energy infrastructure. HVPTL projects are essential for meeting energy needs but are often plagued by risks due to their linear construction nature, leading to project underperformance. However, the lack of attention to risk management often leads to project underperformance. This research aims to identify and rank these risks to facilitate effective risk management. Through literature review and preliminary surveys, 63 risk elements were identified under 14 main categories. These risks were ranked using two rounds of Delphi surveys and the analytical hierarchy process (AHP). The study focuses on a Sri Lankan HVPTL project. The most critical risk factors identified include “improper planning by the main contractor”, “delays in decision-making by the client/consultant”, “errors in initial costing”, and “inaccuracies in survey data”, with AHP analysis assigning significant weights of 43.9%, 18%, 16%, and 14.9% to these factors, respectively. Comparative analysis with similar studies reveals consistent findings, underscoring the importance of addressing delays in approvals, material unavailability, and construction-quality challenges. These results emphasize the necessity of adopting systematic risk-management techniques in HVPTL projects to mitigate uncertainties and enhance project outcomes.

Copyright © Massey University  |  DSpace software copyright © 2002-2025 LYRASIS

  • Contact Us
  • Copyright Take Down Request
  • Massey University Privacy Statement
  • Cookie settings